c+CalcLantern

Fence materials

Plan a straight run of posts, rails and pickets.

How this works

Bays = ceiling(length ÷ maximum spacing); posts = bays + 1. Rails and pickets are estimated separately.

Example

Using the example inputs, posts for one straight run is 14 posts.

Straight fence length
100 ft
Maximum post spacing
8 ft
Rails per bay
2
Picket width
5.5 in
Gap between pickets
0 in
Waste allowance
10 %
Posts for one straight run
14 posts

No gates or corners. Picket estimate uses full run length without subtracting post widths.

Scope and assumptions

Material planning only. Check local permissions, footing requirements, actual lumber sizes and manufacturer details.

Related quantity-calculation reference

Related calculators

Board feet

Deck boards

Even board spacing

Stair rise & run geometry

Ramp slope geometry

BUILT FOR CLARITY

Useful tools. Honest answers.

An original collection of calculators for everyday estimates and learning.

Calculations run in your browser. This site does not send your inputs to a server or serve advertising. Optional analytics runs only after you allow it. Results are estimates within each tool’s stated scope, not professional advice.

Financial, health and building-related tools have specific limitations. Check important decisions with a qualified professional. No live currency rates, tax tables or current price feeds are connected.